If you’ve been following the Total House Construction Series – Foundation to Finish then you know we’ve been pouring the concrete foundation. Well the concrete is finally finished now that the foundation slabs have been poured.

This new house has a unique feature in the basement. The home owner wanted a walkout basement with a garage door so he can store his tractor in there. The building code requires a 4 inch vertical separation between slabs of living space and the storage of vehicles. This way if there is some type of fuel spill the liquid will not run into the living space.

As you can see in the photo the slab on the lower left hand corner is 4 inches lower than the main slab. The foundation slabs inside the house are 4 to 5 inches thick and they have reinforcing fibers embedded in them. The garage slab is the same thickness and it has a combination of a reinforcing steel grid and fibers.

Now that the foundation slabs are finished construction will begin on the new house. Make sure to come back often to follow the construction of this new ranch style home.

Previous Posts:
Total House Construction Series – Foundation to Finish
First Step In Building A New House – Blue Prints
Getting Bids When You Build A New House
New House Energy Efficient Details
House Building Lot
Ranch Style Home Floor Plan
Initial Site Work for House Building Lot
Building Concrete Footings For A New House
Forming Concrete Foundation
Using Concrete Pump Trucks To Pour Foundations

Todd Fratzel

I'm full time builder for a large construction company in New Hampshire. I run their design-build division that specializes in custom homes, commercial design-build projects and sub-divisions. I'm also a licensed civil and structural engineer with extensive experience in civil and structural design and home construction. My hope is that I can share my experience in the home construction, home improvement and home renovation profession with other builders and home owners. I'm also the Editor-in-Chief and Founder of Tool Box Buzz. Please feel free to contact me if you have any questions, suggestions or you'd like to inquire about advertising on this site.

View Comments

  • Making good progress, and thanks for the building code information, makes for interesting reading. Looking forward to the rest of the series.

Share
Published by
Todd Fratzel

Recent Posts

Framing Stick Nailer vs Coil Nailer

Which is Better a Stick Nailer or Coil Nailer? Framers have many choices in nailers…

4 months ago

How Many Roofing Nails Per Square of Shingles

Estimating How Many Nails for a New Roof When it comes to estimating materials for…

4 months ago

Composite / PVC Decking – Layout Tips & Advice

Composite / PVC Decking Layout Tips and Advice Composite and PVC decking have really changed…

5 months ago

Benefits of an ERV System (Energy Recovery Ventilator)

Benefits of ERV Systems (Energy Recovery Ventilator) If you're building a new home or doing…

1 year ago

Vermiculite Attic Insulation Abatement

Vermiculite Attic Insulation If your home was built before 1990 there is a chance it…

1 year ago

Nuisance Tripping of AFCI (Arc Fault) Circuit Breakers

Arc Fault (AFCI) Circuit Breakers Tripping Often An arc-fault circuit interrupter (AFCI) or arc-fault detection…

2 years ago