Leviton 6260M Electronic Timer Switch

Yesterday I received the three Leviton 6260M electronic timer switches that I ordered for the bath fans. These switches allow you to choose pre-set times of 10 min., 20 min., 30 min., and 60 mins. You can buy these dimmers from Amazon, Leviton Decora 60-30-20-10 Preset Minute Electronic Timer. I plan on installing them this weekend in each of the three bathrooms.

Installation Instructions

The unit has 4 wires, a green, white, blue and black. The installation instructions (as usual these directions are not very good) include a wiring diagram that says:

1. Connect the green wire to the ground.
2. Connect the black wire to the line voltage.
3. Connect the blue wire to the hot wire of the fixture.
4. Connect the white wire to all of the neutrals.

I will do a post this weekend on how to wire one of these up. The one problem I can see is the device is fairly large so fitting all the wires, wire nuts and device into the box will most likely be a HUGE challenge.

See my post, How To Install A Leviton 6260M Electronic Timer Switch, on how I installed these new timer switches.

Todd Fratzel

I'm full time builder for a large construction company in New Hampshire. I run their design-build division that specializes in custom homes, commercial design-build projects and sub-divisions. I'm also a licensed civil and structural engineer with extensive experience in civil and structural design and home construction. My hope is that I can share my experience in the home construction, home improvement and home renovation profession with other builders and home owners. I'm also the Editor-in-Chief and Founder of Tool Box Buzz. Please feel free to contact me if you have any questions, suggestions or you'd like to inquire about advertising on this site.

Share
Published by
Todd Fratzel

Recent Posts

Framing Stick Nailer vs Coil Nailer

Which is Better a Stick Nailer or Coil Nailer? Framers have many choices in nailers…

4 months ago

How Many Roofing Nails Per Square of Shingles

Estimating How Many Nails for a New Roof When it comes to estimating materials for…

4 months ago

Composite / PVC Decking – Layout Tips & Advice

Composite / PVC Decking Layout Tips and Advice Composite and PVC decking have really changed…

5 months ago

Benefits of an ERV System (Energy Recovery Ventilator)

Benefits of ERV Systems (Energy Recovery Ventilator) If you're building a new home or doing…

1 year ago

Vermiculite Attic Insulation Abatement

Vermiculite Attic Insulation If your home was built before 1990 there is a chance it…

1 year ago

Nuisance Tripping of AFCI (Arc Fault) Circuit Breakers

Arc Fault (AFCI) Circuit Breakers Tripping Often An arc-fault circuit interrupter (AFCI) or arc-fault detection…

2 years ago